Cronulla Town Centre Stage 2 - Concept Design

Preparation of a Concept Design for Stage 2 of the Cronulla Town Centre Masterplan.

Works start date: Jan 2019

Works end date: Mar 2020

Works location: Cronulla Plaza. View on map

Reason for works

The Cronulla Town Centre is a unique and iconic location, strongly valued by both the local community and visitors to the area. It has significant historic, recreation and community value, and coupled with the surrounding beaches, forms a strong part of our area’s cultural identity. 

In 2015 the Plaza and surrounds were identified as being in need of a significant upgrade and an initial design competition explored the qualities that contributed to the Town Centre’s distinctive character and aspirations for the future.

This was followed by the development of a Cronulla Public Domain Design Strategy, and after extensive research, collaboration with urban design experts and consultation with community, the Cronulla Town Centre Public Domain Master Plan was prepared and adopted by Council in 2018.

With the Master Plan in place, staged delivery of works commenced in 2018 with the upgrade and modernisation of Stage 1 - Ocean Grove.  To download a copy of the Masterplan click here.

Council is currently preparing a Concept Design for Stage 2 of the Cronulla Town Centre Masterplan.  Stage 2 consists of the main body of the Plaza between the Kingsway and Ocean Grove; the southern Kingsway footpath between Gerrale and Croydon Streets; and a public toilet facility in the southern part of Cronulla Street.

Scope of works

The scope of this project is to produce a concept design for the Plaza. Elements within this project, include:

  • Investigation, research and analysis of existing conditions.
  • Concept design for the Plaza from the Kingsway to Ocean Grove including seating, dining, lighting.
  • Concept design the laneways connecting to the Plaza.
  • Consultation through a Reference Group of concept design options.
  • Direct engagement with Plaza business owners.

Public impacts during construction

In this early stage of the project the only public impacts are likely to be from contractors undertaking investigatory work such as geotechnical investigation and services location. 

Funding

This project is funded by Sutherland Shire Council from the Shopping Centres Upgrade Program.

Project Schedule

We will update this chart as we move through the process of developing a Schematic Design.

Cronulla-Plaza-timeline.jpg

More information

Enquiries

or

Did this page help you?

We monitor feedback and will respond to your comments if you include your email address.



Please type the characters you see in the picture below

Please type the code in the box above